Technical Visit

Any registered participant of the conference is eligible for the technical visit without any additional cost. However, you need fill and submit the requisition form given on the first day of conference since we have only 40 seats available; booking will be on first come first serve basis.

Journey Plan

The visit is on the last day of the conference, 21st December, 2016 to Mumbai Metro Control Room, and details of the journey is as follows.

(Pick up) IIT Bombay -- Metro Control Room -- (return) IIT Bombay

(Pick up) 2.00 pm -- 3:30-4:30 pm -- 6:00 pm

No. Timing Event
1 2:00 pm Bus Starts from IITB
2 2:45 pm Arrival at Sakinaka Metro Station
3 2:45 pm to 3:00 pm Boarding train at Sakinaka Metro Station
4 3:00 pmt 3:30 pm Train ride upto D N Nagar Metro station and proceed towards OCC building in Metro Depot
5 3:30 pmt 3:45 pm Brief Background of Project by Kshitij Hinger (Classroom, OCC Building, 1 st Floor)
6 3:45 pmt 4:30 pm Visit to IMR, SCR and Simulator rooms
7 4:30 pmt 4:45 pm Question and Answer Session (Classroom, OCC Building, 1st Floor)
8 4:45 pmt 5:00 pm Boarding bus for onward journey to IITB
9 5:00 pmt 6:00 pm Bus reached IITB

Mumbai Metro Control Room

Operation Control Centre keeps the city's first Metro project, the 11.04-km Versova-Andheri-Ghatkopar line, up and running through good and bad times.

The Operation Control Centre (OCC) is divided into 6 sections: Chief Controller, Traffic Controller, Traction Power Controller, Auxiliary System Controller, Depot Controller and Timetable Planner.

Different sections in the Operation Control Centre handle six vital operational aspects of the Metro.
Visit Includes: Operation Control Centre (OCC) and Metro Simulator.

*Changes in the program can be made if required by the Organizing Committee at its sole discretion.