LIST OF CONSULTANCY PROJECTS COMPLETED AND ON GOING

As Principle Investigator as Well as Co-Principle Investigator

During Year 2005-2006

  1. Air India Nallah System – Technical Advice on Construction of Air India Nallah from Air India Colony to Mithi River including Modification of Culverts, Santacruz(E) in H/East ward, MCGM Mumbai, Principal-Investigator
  2. Expert Advice on flooding problem in Indian Airlines Colony, Kalina-Kurla Road,  Santacruz (E), Mumbai, Principal-Investigator

 

  1. Study on Drainage system of Nerul with reference to  Deletion of Holding Pond, CIDCO Mumbai,   Co-Principal Investigator (PI-Prof. M.C. Deo)
  2. Physical Model studies for Bheema Lift irrigation Project Lift 2, Stage 1, Navayuga Engineering Company Ltd., Hyderabad, Co-Principal Investigator (PI-Prof. T.I. Eldho)
  3. Physical Model studies for Bheema Lift irrigation Project Lift 1, stage 1, Patel Engineering Company Ltd., Hyderabad, Co-Principal Investigator (PI-Prof. T.I. Eldho)
  4. Physical Model studies of Stage 2 Kalvakuruthy Lift irrigation Project, Navayuga Engineering Company Ltd., Hyderabad, Co-Principal Investigator (PI-Prof. T.I. Eldho)
  5. Technical opinion on providing floodgates at Gazar Bandh Nallah, MCGM,Mumbai, Co-Principal Investigator (PI-Prof. T.I. Eldho)
  6. Technical design of the roadside and ROW drains in 18 corridors of MMRDA roads, MMRDA Mumbai, Co-Principal Investigator (PI-Prof. M.C. Deo)

 

During Year 2006-2007

  1. IIIA Mumbai Water Supply Project Seepage in Liberty Garden Tunnel Shaft, MCGM, Mumbai, Principal-Investigator
  2. Vetting of Drainage design and expert advice to prepare master plan of Mumbai International Airport , Mott MacDonald, Mumbai, Principal-Investigator
  3. Study of Flooding and Drainage problem of MAHDA colony at Dindoshi, Malad, Mumbai, M/S Shirke Construction Technology Pvt. Ltd, Pune, Principal-Investigator
  4. Physical model study of STPP Sump Pump , GAMMON India Pvt. LTD. Mumbai, Principal-Investigator (On going)

 

  1. Rapid EIA of New Airport at Panvel – CIDCO,  CIDCO, Navi Mumbai, Co-Principal Investigator (PI- Prof. S.K. Gupta, CESE)
  2. Design of integrated storm water drainage network at MIDC Taloja Industrial area, MIDC, Navi Mumbai, Co-Principal Investigator (PI-Prof. K.V. Krishna Rao)

 

During Year 2007-2008

  1. Vetting the Design of Drinking water Supply Pipe design, PWD , UT of Dadra Nagar Haveli, Silvassa, Principal-Investigator
  2. Vetting of Consultants report on "Flood Control Measures in MIDC-TTC Industrial Area", Chief Engineer, MIDC, Mumbai, Principal-Investigator
  3. Vetting the DPR of the decentralized sewerage system for MBMC, MBMC Maharashtra, Principal Investigator (shifted from  Prof. S.K. Gupta, CESE)
  4. Comprehensive study of the water storage structures in JNPT, Jawaharlal Nehru Port Trust, Nava Seva, Mumbai. Principal Investigator. (On going)

 

  1. Strom Water Drainage Design – Technical Adviser, Maersk – ERS-Express Repair Service Mumbai, Co-Principal Investigator (PI- Prof. D. N. Singh)
  2. Water Quality implications of the Polavaram Dam on Disposal and abstraction of water from Godavari River, ITC Bhadrachalam AP, Co-Principal Investigator (PI- Prof. Shyam R. Asolekar, CESE)
  3. Review of Surge Analysis Study, HCC Ltd., Mumbai, Co-Principal Investigator (PI- Prof. M. C. Deo)

 

During Year 2008-2009

  1. Checking of the design for surge vessel required for Maharashtra Jeevan Pradhikaran, Nashik A/C Sinnar Water Supply Scheme, Allied electro-Mechanicals (P) Ltd. Pune, Principal-Investigator

 

  1. Feasibility work to augment carrying capacity of Mithi River width in the stretch of Mumbai Airport, Mumbai International Airport Pvt. Ltd, Co-Principal Investigator (PI- Prof. S.K. Gupta, CESE)
  2. Hydrographic analysis of Mithi River under discharging capacity, MMRDA, Co-Principal Investigator (PI- Prof. S.K. Gupta, CESE)
  3. Expert Opinion of CW channel, Tata Consulting Services, Mumbai, Co-Principal Investigator (PI- Prof. M. C. Deo)

 

During Year 2009-2010

  1. Design vetting for Hydraulic, Hydrologic and Structural Design of Storm Water Drain for Sikkim Airport, Mott MacDonald, Mumbai, Principal-Investigator 
  2. Review Work and designs of Varaladevi lake improvement and development project in Bhiwandi Niampur City, Bhiwandi Nizampur City Municipal Corporatiion, Principal-Investigator 
  3. Proof Checking of Drawings, Plans, and Design of Underground sewerage system of Mira Bhayandar City, Mira Bhayandar Municipal Corporation, Principal-Investigator  (On going)
  4. Review of design of water supply distribution system improvement and agumentation project in Bhiwandi Nizampur City, Bhiwandi-Niampur City Municipal Corporation,  Principal-Investigator  (On going)
  5. Monitoring of work and designs of Underground Sewerage system for Navi Mumbai Municipal Corporation, Navi Mumbai Municipal Corporation, Principal-Investigator  (On going)
  6. Monitoring of Work & Designs of Integrated Water Supply System Improvement and Augmentation Project in Navi Mumbai City, Navi Mumbai Municipal Corporation, Principal-Investigator  (On going)
  7. Hydraulic study of the existing and additional channel for the Mithi River, Mumbai International Airport Pvt Ltd, Principal-Investigator  (On going)
  8. Effect of Climate Change on Design Waves, ONGC. Principal Investigator (shifted from  Prof. M.C. Deo, CE) (On going)

 

  1. Sump Pump Model Study, Jyoti Pumps Limited, Gujarat, Co-Principal Investigator (PI-Prof. T.I. Eldho)

 

During Year 2010-2011

  1. Vetting of hydrologic design of Mugaon Dam and promenade level, Consulting Engineering Services (India) Pvt. Ltd., Principal-Investigator
  2. Design Build & operate Leachate Treatment Plant of adequate capacity to treat leachate generated from 44000 sq. m landfill sites under solid waste disposal at Turbhe in Navi Mumbai , Navi Mumbai Municipal Corporation, Principal-Investigator.
  3. Scrutiny of designs prepared by M/S/kyway Infra Projects for work of Kulgaon-Badlapur Sewerage Project and Clearance to necessary modifications during execution as III party, Kulgaon Badlapur Municipal Council, Principal-Investigator  (On going)

 

  1. Hydraulic Model Studies for Intake well, Nagarjuna Constructions Co. Ltd, Hyderabad, Co-Principal Investigator (PI-Prof. T.I. Eldho) (On going)
  2. Expert Opinion / Advice on Testing of Hydro-Kinetic Energy Conversion System, Nostrum Technologies Pvt. Ltd, Co-Principal Investigator (PI-Prof. T.I. Eldho)  (On going)

 

During Year 2011-2012

  1. Drainage study of PA-2 area of Dronagiri SEZ, Navi Mumbai, Navi Mumbai Special Economic Zone (NMSEZ) Development Co. Pvt. Ltd. Principal-Investigator  (On going)
  2. Technical Review of Works of Rejuvenation and Renovation of Bhokarpada Water Treatment Plant, Navi Mumbai Municipal Corporation, Principal-Investigator  (On going)
  3. Technical Review of Work of Renovation and Rejuvenation of 19 lakes in NMMC, Navi Mumbai Municipal Corporation, Principal-Investigator  (On going)
  4. Expert Opinion on Construction of Dam on Balganga River Near Village Niphad, Tal. Pen. Dist. Raigad Co-Principal Investigator (PI-Prof. R.S. Jangid) (On going)