Technical Visit
A registered participant can choose one from the two technical visit options; Mumbai Metro Control Room or Mumbai Monorail Ride.
Option A. Mumbai Metro Control Room
Operation Control Centre keeps the city's first Metro project, the 11.04-km Versova-Andheri-Ghatkopar line, up and running through good and bad times.
The Operation Control Centre (OCC) is divided into 6 sections: Chief Controller, Traffic Controller, Traction Power Controller, Auxiliary System Controller, Depot Controller and Timetable Planner.

Option B. Mumbai Monorail Control Room
Visit to Mumbai Monorail, " the first monorail in India since the Kundala Valley Railway and Patiala State Monorail Trainways were closed in the 1920s ".
Mono Rail carries 7,500 commuters per hour per direction and has the capacity to carry 1.5 to 2 lakh commuters daily. Many parts of the city which are not connected by
suburban rail system or Metro rail will be connected by Monorail.

Program
Two options are made available to all conference attendees, they can choose either Option A or Option B.
Note. Registration for technical visit will be open to all conference attendees during 1st day of the conference. Registration will be completed on a first-come first-served basis. Once we reach our maximum limit for an option, the registration for this visit will be closed.
*Changes in the program can be made if required by the Organizing Committee at its sole discretion.


